Assembly

No heavy-duty lifting equipment is needed for the assembly. Smaller buildings can be erected using only scaffolding. Larger buildings (with a width over 10m) do, however, require the use of a scissor-lift platform.

The first stage of the assembly is to prop the fastening strips of the arches onto the plinths. The next stage is erecting the arches. The first arch must be well supported but the support can be removed once 5-7 arches have been joined together. The final stage is the placement of end walls.



Plinth slats attached to concrete.

Manual installation of the roof part from the from the access platform. We can rent access platforms where required. The scissor-lift platform should preferably by at the location before work starts.

The first arches must be carefully supported in the beginning stages. The support may be removed once 5-7 arches have been erected.

Installation of the roof part.

Finished end wall.

Walls ready for installation.

Foundations are usually laid by the customer. The customer should also ensure there is a scissor-lift platform (preferably a four-wheel driven, sufficiently-sized, serviced diesel machine) at the site.

There are several options for installing steel arch halls to suit the needs, skills and budget of every customer. We always deliver all the required steel parts.



Options:

  1. Ready to use: includes installation of the building onto a previously laid foundation.

  2. The customer has use of their own manpower but a representative of our company will come guide and assist during the start of the assembly or at various points of the project. This is charged by whole working days according to the required amount and with the addition of travel expenses.

  3. Independent assembly. Instructions are provided at our factory or another location before work starts.

Installation time with 2-3 workers 50-60m² ready in a day!



Stacking bolts M8 with seals

Support frame for the end wall.

End wall installation slats.