heavy-duty lifting equipment is needed for the assembly. Smaller
buildings can be erected using only scaffolding. Larger buildings
(with a width over 10m) do, however, require the use of a
scissor-lift platform.
The first stage of the assembly is to
prop the fastening strips of the arches onto the plinths. The next
stage is erecting the arches. The first arch must be well supported
but the support can be removed once 5-7 arches have been joined
together. The final stage is the placement of end walls.
Foundations
are usually laid by the customer. The customer should also ensure
there is a scissor-lift platform (preferably a four-wheel driven,
sufficiently-sized, serviced diesel machine) at the site.
There
are several options for installing steel arch halls to suit the
needs, skills and budget of every customer. We always deliver all the
required steel parts.
Options:
Ready to use: includes installation of the building onto a previously laid foundation.
The customer has use of their own manpower but a representative of our company will come guide and assist during the start of the assembly or at various points of the project. This is charged by whole working days according to the required amount and with the addition of travel expenses.
Independent assembly. Instructions are provided at our factory or another location before work starts.
Installation time with 2-3 workers 50-60m² ready in a day!